Know whether your grid connection is enough before hardware decisions harden.

Fenexity packages grid sizing as a clear assessment: what data is needed, what scenarios are tested, what decision artifacts are delivered, and what remains outside the scope.

Grid limit scenarios

Charger and schedule tradeoffs

Assumptions sheet included

Best for

Pre-procurement planning

Before charger count, charger power, or grid expansion becomes locked into a tender.

Grid-constrained depots

When connection capacity, peak-load risk, or utility timelines constrain fleet rollout.

Phase-in decisions

When the first depot stage must not block later fleet growth or PV/battery integration.

Core deliverables

Data checklist

Fleet, route, charger, grid, tariff, site, and system inputs required to build the first model.

View details

Scenario comparison

Uncontrolled charging, smart scheduling, charger-count variants, grid-limit variants, and readiness impact.

Decision memo

Procurement-safe recommendation with assumptions, sensitivity factors, exclusions, and next-step options.

Offer boundary

Offer boundary
TopicIncludedDefined during scoping
TimelineWorking structure for a focused assessmentActual delivery SLA
PricingQuote-based entry pointFixed fee / setup fee / bundled package
InputsFleet plan, schedules, chargers, grid limit, tariff signalsMinimum data-quality threshold
OutputsModelled scenarios, assumptions sheet, recommendationPublic numeric ranges

Offer scope

Delivery timeline, price basis, and public numeric results depend on the assessment scope and available project data.